LM 2500 Pre Purchase Inspection

 

 

 

 

 

 

 

HOUSTON- LM2500 GAS TURBINE

 

Interlink power systems was engaged to complete a refurbishment and retrofit study of a number of a LM2500 gas turbine packages. Interlink completed a design and program to

• install a new control system,

• package wiring and new instrumentation,

• overhaul and zero hour the LM2500 Gas Turbine

• complete the balance of plant upgrade

Also complete a full installation and commissioning program of the unit for a USA based company.

david

You must be logged in to post a comment.